AccessPro Solutions Accessibility assessment & advisory Discuss your project

Audit method / On-site assessment

Accessibility audits

An on-site assessment of how accessible a building is, measured against the requirements confirmed for your premises, and written up as a ranked register of what to address and in what order.

Visit
Walked as visitors and staff do
Output
Ranked findings register
Compliance decision
Made by the building authority

Inspection sequence

Stage
What happens
Record produced
A.1

Scope

What happens:

We agree the premises, the requirements the assessment is measured against, and the areas in scope.

Record produced:

Written scope record

A.2

Survey

What happens:

On-site walkthrough of the approach, entrance, circulation routes, facilities and egress provisions.

Record produced:

Site notes and keyed photographs

A.3

Analyse

What happens:

Observations checked against the applicable requirements and ranked by impact and effort.

Record produced:

Ranked findings register

A.4

Report

What happens:

A written report with a recommended action and the requirement behind each finding.

Record produced:

Assessment report

A.5

Advise

What happens:

We walk you through the report and answer questions from your team.

Record produced:

Findings review with your team

Each element is checked against the requirements confirmed for the premises at scoping, along the routes people actually take.

Inspection scope

  1. B.01Approach and entrances
  2. B.02Ramps, steps and handrails
  3. B.03Doors and thresholds
  4. B.04Corridors and circulation
  5. B.05Lifts and level changes
  6. B.06Washroom accessibility
  7. B.07Signage and wayfinding
  8. B.08Workspaces and service points
  9. B.09Lighting and contrast
  10. B.10Emergency egress

What each finding includes

Recorded condition, impact, recommended action and priority — written so a contractor and a board member can both use the same document.

Findings register

Every observation numbered, located on a marked plan and ranked by impact and effort.

Recommended actions

One recommended next action per finding, written for the team that will carry it out.

Requirement references

The requirement recorded for your premises noted against each finding.

Management summary

A short brief for leadership and decision-makers.

Inspection record — multi-floor office access review

Existing commercial office premises, Central Hong Kong.

Case scenario
Property
Existing commercial office premises
Location
Central Hong Kong
Area reviewed
18,500 sq ft
Floors reviewed
3 occupied
Site review
1 working day
Recorded observations
47
Priority 1 findings
8
Priority 2 findings
21
Priority 3 findings
18
Report issue target
5 working days

Findings distribution

  • Priority 1 — 8 findings where access is prevented
  • Priority 2 — 21 findings where access is restricted or assisted
  • Priority 3 — 18 findings recorded for planned improvement

Scope reviewed

Street approach, principal entrance, reception, lift lobby, internal circulation, meeting rooms, staff facilities, accessible washroom, signage and emergency egress provisions.

Evidence produced

47 keyed photographs, marked floor-plan references and one prioritised findings register, issued within a 5 working day target after the site review and closed with a 90-minute findings review.

Illustrative sample finding.

Inspection record — clarifications

Certification
Statutory compliance is determined by the relevant building authority, not by a consultant. The assessment records where the premises stand against the requirements confirmed at scoping, and what to do about it.
Applicable reference
The legislation, accessibility requirements and project standards relevant to the premises. These are confirmed during scoping, recorded in the report, and agreed before the survey begins. Where a project chooses to exceed the statutory minimum, published guidance such as ISO 21542 can also be used.
Existing and older buildings
Requirements commonly apply to new buildings and to alterations and additions to existing ones, and anti-discrimination duties can create separate obligations for premises already in use. Which apply to a given building is confirmed during scoping.
Construction works
Not undertaken by AccessPro. The output is a prioritised, effort-ranked plan for the client’s own architects and contractors; their proposals can be reviewed against the requirements recorded for the project.
Duration
Dependent on the size and complexity of the site and the number of locations involved. Timing is scoped before a visit is booked.
Multiple premises
A multi-site assessment applies the same survey checklist and reporting structure at every premises, with the applicable requirements confirmed for each location before survey. Findings roll into one register, alongside a per-site action plan.

Send a short brief on the premises and project stage, and we will reply with scoping questions before any work is proposed.

Discuss your project