AccessPro Solutions Accessibility assessment & advisory Discuss your project

Field report / Independent accessibility assessment

Accessibility assessed on site, recorded finding by finding.

We survey buildings, workplaces and public spaces against the accessibility requirements agreed for the project, then set out each observed condition, the requirement it relates to, and the order in which to address it.

Role
Assessment & advisory only
Base
Hong Kong
Output
Ranked findings register

Drawing GF-01 — Ground floor, inspection points

Not to scale
Street entranceStep at entrance; no level route.Priority Circulation routeCorridor width reduced by furniture.Review Accessible washroomTransfer space partly obstructed.Review Signage and wayfindingNo directional signage from the lobby.Recorded Emergency egressStair-only escape; no refuge identified.Priority

Fig. 1 — Inspection points 1–5 keyed to the inspection schedule tab. Locations indicative; project requirements are confirmed at scoping.

Inspection scope

Each building area in scope is assessed, documented, prioritised and advised on. The full audit scope is set out under Accessibility audits.

  • Approach and entrance

    Street approach, thresholds, door operation, call points.

  • Horizontal circulation

    Clear widths, turning space, floor surfaces, obstructions.

  • Vertical circulation

    Lifts, stairs, handrails, platform lifts where present.

  • Sanitary facilities

    Accessible cubicles, fittings, transfer space, door hardware.

  • Signage and wayfinding

    Directional signage, contrast, mounting, decision points.

  • Service counters and controls

    Counter heights, reach ranges, switches, entry systems.

  • Emergency egress

    Escape routes, refuge provision, alarm and evacuation arrangements.

Coverage is set at scoping. Areas outside the agreed scope are named in the report so the boundary of the assessment is explicit.

Inspection record — multi-floor office access review

Existing commercial office premises, Central Hong Kong.

Case scenario
Property
Existing commercial office premises
Location
Central Hong Kong
Area reviewed
18,500 sq ft
Floors reviewed
3 occupied
Site review
1 working day
Recorded observations
47
Priority 1 findings
8
Priority 2 findings
21
Priority 3 findings
18
Report issue target
5 working days

Assessment scope

Street approach, principal entrance, reception, lift lobby, internal circulation, meeting rooms, staff facilities, accessible washroom, signage and emergency egress provisions.

Evidence and follow-up

47 keyed photographs, marked floor-plan references and one prioritised findings register. Closed with a 90-minute findings review with the client team.

Featured finding

AP-ENT-07 Ground floor / Principal entrance Priority 1 — independent entry is prevented
Observed condition
A 95 mm stepped threshold interrupts the only direct public entrance route. No level or ramped alternative is identified at the entrance.
Measured condition
Clear door opening measured at approximately 780 mm.
Impact
Independent entry is prevented for anyone using a wheelchair, a walking aid or a pram, and every route beyond the entrance becomes unreachable without assistance.
Priority
Priority 1.
Recommended next action
Ask the appointed design team to test a compliant ramped approach, platform-lift solution or alternative accessible entrance, then coordinate the preferred option with door clearances, weather protection and the internal circulation route.
Evidence recorded
Dated site photograph, threshold measurement and keyed plan location.

Evidence register

  • P-07Entrance photographRecorded
  • M-03Threshold measurement95 mm
  • D-01Clear-opening dimension780 mm
  • PL-02Keyed floor-plan locationPlan GF

Evidence references as they appear in the findings register issued to the client team.

Illustrative sample finding.

How an assessment runs

  1. C.1

    Brief

    We agree the premises in scope, the requirements the assessment will be measured against, and the stage the project is at. The scope is confirmed in writing before any visit.

  2. C.2

    Site review

    We walk the premises along the routes staff and visitors actually take, recording conditions, photographs and plan references as we go.

  3. C.3

    Findings

    Each observation is written up as a numbered finding: location reference, observed condition, the requirement it relates to, and a recommended action.

  4. C.4

    Prioritisation

    Findings are ranked by the access they block and the effort to resolve, so the register reads as an order of works rather than a list of faults.

  5. C.5

    Final report

    You receive the findings register, the prioritised sequence, and the record of the requirements and scope the assessment was carried out against.

  6. C.6

    Advisory follow-up

    We review contractor proposals against the findings, re-inspect after works where asked, and update the register when requirements or occupancy change.

What we measure against

The legislation and project standards an assessment is measured against are confirmed during scoping and recorded in the report.

Requirement category
What is examined
Resulting evidence

Applicable legislation and project standards

What is examined:

The statutory requirements and project standards recorded for the premises at scoping.

Resulting evidence:

A written record in the report of what the assessment was measured against.

Landlord or portfolio standard

What is examined:

Any internal access standard you already work to across your estate.

Resulting evidence:

Findings mapped to your own standard so results compare across sites.

Approach, entrance and circulation

What is examined:

Continuity of the route from the street to each occupied area.

Resulting evidence:

Numbered findings with plan references and dated photographs.

Facilities and equipment

What is examined:

Sanitary facilities, lifts, counters and controls within the agreed scope.

Resulting evidence:

Condition entries with recommended actions and priority ranking.

Emergency egress

What is examined:

Escape routes, refuge provision and evacuation arrangements for disabled occupants.

Resulting evidence:

Findings written for coordination with your fire strategy author.

Reference guidance beyond the minimum

What is examined:

Published guidance applied only where a project chooses to exceed the statutory minimum.

Resulting evidence:

Findings marked as benchmark-based rather than statutory.

Premises we assess

Premises

  • Offices and workplaces in occupation
  • Retail units and customer-facing premises
  • Hospitality, food and beverage venues
  • Education and training facilities
  • Clinics and healthcare premises
  • Public-facing civic and cultural spaces

Project situations

  • Existing premises needing a baseline assessment
  • Design-stage drawings under review before works start
  • Fit-out or refurbishment being planned
  • Several sites needing one consistent reporting structure
  • Contractor proposals needing review against findings
  • Re-inspection after works have been completed

Premises or programmes not listed here are assessed on the same basis; the applicable scope is set at scoping.

Send a short brief on the premises and project stage, and we will reply with scoping questions before any work is proposed.

Discuss your project